_ 80 Tons High Speed Dynamic Balancing System _



GENERAL  INFORMATION

Description:

Construction of steel & reinforced concrete structure besides architectural & mechanical works (installation)

Client:

Ministry of Energy

Execute Date:

1998

Locality:

Tahran-Karaj

PROJECT  HIGHLIGHTS

Total Concrete Volume:

4'500 m3
Total Formworks: 6'000 m2
Total Reinforcements: 330 tons
Total Steelworks: 100 tons
Total Area: 4'600 m2
E-mail: polodejco@polodej.com